Field of activity

  • GSM infrastructure

    Base Station Survey, BTK certificated EMR measurement, RBS Installation-Disassembly (RBS 2206, 2216, 2106, Motorola H1, H2), Base Station SWAP, Base Station Extention ve Revision ,tower installation,3G Installation.

  • Energy infrastructure installation

    AG, OG Installation-Disassembly
    Generator Installation-Disassembly-Maintenance
    UPS Installation
    Battery Installation-Maintenance

  • PABX Switchboard Installation

    Alcatel Lucent,
    Siemens,
    Netaş

  • Transmission

    Radio Link Systems Survey and Installation
    TN (Ericsson), PTN (Huawei) Systems Survey and Installation
    HDSL Systems
    Fiber-optic Cable Installation
    Site Accusation
    Automation Systems Sale and Installation

3G Installations

3g-1.jpeg
3g-3.jpeg
3g-2.jpeg
3gkurulum2-1.jpg
3gkurulum2-1.jpeg
3gkurulum2-2.jpeg
3gkurulum2-3.jpeg
3gkurulum2-4.jpeg
3gkurulum2-5.jpeg
3gkurulum2-6.jpeg
3gkurulum2-7.jpeg
3gkurulum2-8.jpeg

New Site Installations

yeni-site-3.jpeg
yeni-site-2.jpeg
yeni-site-1.jpeg
yenisite-kurulum2-1.jpeg
yenisite-kurulum2-2.jpeg
yenisite-kurulum2-3.jpeg
yenisite-kurulum2-4.jpeg
yenisite-kurulum2-5.jpeg
yenisite-kurulum2-6.jpeg
yenisite-kurulum2-7.jpeg
yenisite-kurulum2-8.jpeg
yenisite-kurulum2-1.jpg
yenisite-kurulum2-2.jpg
yenisite-kurulum2-3.jpg
yenisite-kurulum2-4.jpg
yenisite-kurulum2-5.jpg
yenisite-kurulum2-6.jpg
yenisite-kurulum2-7.jpg
yenisite-kurulum2-8.jpg
Transmission (5)
Transmission (4)
Transmission (3)
Transmission (3)
Transmission (2)
Transmission (2)
Transmission (1)
Transmission (1)

F/O Infrastructure Work

fo-altyapi-3.jpeg
fo-altyapi-2.jpeg
fo-altyapi-1.jpeg
fo-kablo-1.jpeg
fo-kablo-2.jpeg
fo-kablo-3.jpeg
fo-kablo-4.jpeg
fo-kablo-5.jpeg
fo-kablo-7.jpg
fo-kablo-6.jpeg
fo-kablo-1.png
fo-kablo-1.jpg
fo-kablo-2.jpg
fo-kablo-3.jpg
fo-kablo-4.jpg
fo-kablo-5.jpg
fo-kablo-6.jpg

F/O Additional Production

fo-ilave-uretim (4)
fo-ilave-uretim (3)
fo-ilave-uretim (2)
fo-ilave-uretim (1)